内容标题38

  • <tr id='F66BbQ'><strong id='F66BbQ'></strong><small id='F66BbQ'></small><button id='F66BbQ'></button><li id='F66BbQ'><noscript id='F66BbQ'><big id='F66BbQ'></big><dt id='F66BbQ'></dt></noscript></li></tr><ol id='F66BbQ'><option id='F66BbQ'><table id='F66BbQ'><blockquote id='F66BbQ'><tbody id='F66BbQ'></tbody></blockquote></table></option></ol><u id='F66BbQ'></u><kbd id='F66BbQ'><kbd id='F66BbQ'></kbd></kbd>

    <code id='F66BbQ'><strong id='F66BbQ'></strong></code>

    <fieldset id='F66BbQ'></fieldset>
          <span id='F66BbQ'></span>

              <ins id='F66BbQ'></ins>
              <acronym id='F66BbQ'><em id='F66BbQ'></em><td id='F66BbQ'><div id='F66BbQ'></div></td></acronym><address id='F66BbQ'><big id='F66BbQ'><big id='F66BbQ'></big><legend id='F66BbQ'></legend></big></address>

              <i id='F66BbQ'><div id='F66BbQ'><ins id='F66BbQ'></ins></div></i>
              <i id='F66BbQ'></i>
            1. <dl id='F66BbQ'></dl>
              1. <blockquote id='F66BbQ'><q id='F66BbQ'><noscript id='F66BbQ'></noscript><dt id='F66BbQ'></dt></q></blockquote><noframes id='F66BbQ'><i id='F66BbQ'></i>
                塑胶跑道,EPDM塑胶跑道,硅PU球场,丙烯酸∩球场,人造草坪

                主页 > 硅PU球场 > 硅PU网球场 >

                硅PU网球场材料好么

                2022-01-15 16:04 硅PU网球场

                    网球场种类繁多,很多人把PU网球☉场误认为是硅PU网球场。但两种是不同的材料,其施工工序也不同→,那么硅PU网球场施工工序有哪些呢?


                    1、基础面处理:网球场施工前将场地Ψ清洗干净,固化养护期不少于20天。


                    2、铺设↙弹性层:以平刮板或齿刮板铺设于基面,每道铺设「厚度不能超过1.5mm,每道铺设时间间隔以前一道干固为准(一般约10小时,具体视现场天气情况而定),直至铺设到所需厚度。值得注意的是,网球场施工的弹性层铺设干固后,用积水法测试地面平整度,积水处需补平后∞再铺设加强层。


                    3、铺设加强层:以胶刮板分两道铺设约0.8mm厚于弹性◆面上,铺设后表面要求平整光滑。


                    4、铺设※耐磨面层:将材料配比充分混合搅拌均匀,铺设于加强面上,一般卐铺设两道。


                    5、划线:按标准尺寸量度定位,用帆布线标出线条∑ 位置,然后再用美纹纸沿帆布线贴在球场上,用专用划线漆按比例充分混和均匀用毛刷刷于两△美纹纸之间,待材料表干后把美纹纸撕掉即可。


                    6、清场完工:网球场施工人员完工后,清场。